Generator Kekebalan Transien Otomotif
Pengguna manual
berlaku LISUN Model: EMS-ISO7637-P123-80V100A、EMS-ISO7637-P123-80V30A、EMS-ISO7637-P123-80V50A、EMS-ISO7637-P1235-80V100A、EMS-ISO7637-P1235-80V30A、EMS-ISO7637-P1235-80V50A、EMS-ISO7637-P5-80V100A、EMS-ISO7637-P5-80V30A、EMS-ISO7637-P5-80V50A
1. Pemahaman Dasar tentang Peralatan
1.1 Klasifikasi Model
| LISUN Pilih Model | EMS-ISO7637-P1235-80V30A | EMS-ISO7637-P123-80V30A | EMS-ISO7637-P5-80V30A |
|---|---|---|---|
| Nama Produk | Generator Kekebalan Transien Otomotif | Automotive Electronic Load Dump Simulator | |
| Tegangan dan Arus DUT | Built-in Coupling Decoupling Network: 80 V/30 A (optional: 80 V/50 A and 80 V/100 A) | ||
| Control System | 10.1-inch Chinese-English Android Capacitive Touchscreen Display + Supports Remote Control via PC Software | ||
| Bentuk Gelombang Uji | Pulse 1, Pulse 2a, Pulse 3a, Pulse 3b, Pulse 5a, Pulse 5b | Pulse 1, Pulse 2a, Pulse 3a, Pulse 3b | Pulse 5a, Pulse 5b |
| Lainnya | Supports immunity testing for 12V/24V automotive electronic systems; features built-in standard test parameters that can be accessed with a single click, and supports user-defined parameters | ||
1.2 Standar yang berlaku
| Nomor Standar | Nama |
|---|---|
| ISO 7637-2: 2021 | Road Vehicles—Electrical Disturbances from Conduction and Coupling—Part 2: Electrical Transients Conduced Along Supply Lines Only |
| ISO 7637-3: 2016 | Road Vehicles—Electrical Disturbances from Conduction and Coupling—Part 3: Electrical Transient Transmission by Capacitive and Inductive Coupling via Lines Other Than Supply Lines |
| ISO 16750-2: 2023 | Road Vehicles—Environmental Conditions and Testing for Electrical and Electronic Equipment—Part 2: Electrical Loads |
1.3 Skenario Aplikasi
The EMS-ISO7637 Automotive Transient Immunity Generator (also known as the Automotive Electronic Immunity Test System) is a professional test instrument independently developed by LISUN. It is designed to simulate various typical electromagnetic disturbances generated during normal vehicle operation, as well as changes in the vehicle’s onboard power supply that occur during vehicle startup, the switching of electronic devices, and battery charging and discharging. The waveforms generated by the equipment comply with the ISO 7637 series of international standards and meet the requirements of most automotive manufacturers for in-vehicle electronic immunity testing.
Applications include: conducted immunity testing of electronic components such as automotive ECUs, sensors, and controllers; verification of electromagnetic compatibility (EMC) performance for automotive components prior to shipment; validation and optimization of circuit protection solutions during the R& D phase; and compliance testing by third-party testing laboratories.
2. Tindakan Pencegahan untuk Penggunaan
2.1 Persyaratan Lingkungan
Ambient temperature: 23 °C ± 5 °C; relative humidity: 45–75%, non-condensing; altitude: ≤2000 m; no strong vibrations or electromagnetic interference in the surrounding area; use of the equipment in dusty or flammable and explosive environments is strictly prohibited.
2.2 Persyaratan Catu Daya
Input power supply: AC 220 V ±10%, 50 Hz; Input power: ≤1 kW; The power supply must be reliably grounded, with a grounding resistance of ≤1 Ω; It is recommended to use a voltage-stabilized power supply to prevent power grid fluctuations from affecting test accuracy.
2.3 Prinsip-prinsip Pengkabelan
Use power cables with the specified wire gauge to prevent overheating under high current conditions; keep test cables as short as possible and route them in parallel to minimize the impact of parasitic parameters; ensure that the DUT (Device Under Test) enclosure is reliably connected to the equipment’s protective ground; and route signal and power cables separately to avoid cross-interference.
2.4 Pedoman Keselamatan Operasional
Wear insulated protective gear; before testing, ensure all connections are secure and that there are no exposed conductors; do not plug in or unplug test cables during testing to avoid arc burns; do not touch the DUT or test fixtures while the pulse is being output; if you hear unusual noises, smell an unusual odor, or see smoke, immediately disconnect the power; During prolonged continuous testing, ensure the equipment is properly ventilated for heat dissipation.
3. Gambaran Umum Peralatan dan Pengkabelan
3.1 Panel depan
Lihat Gambar 3-1.
| Jumlah | Note |
|---|---|
| ① | Tombol daya perangkat: Tekan sebentar untuk menghidupkan; tekan dan tahan untuk mematikan. |
| ② | Layar Sentuh Kapasitif 10.1 inci |
| ③ | Port USB1: Digunakan oleh LISUN Para insinyur dapat menggunakannya untuk debugging perangkat; pengguna tidak perlu menggunakannya. |
| ④ | Port USB 2.0, yang dapat digunakan untuk menghubungkan mouse untuk mengontrol layar sentuh, atau untuk menghubungkan flash drive USB untuk memperbarui perangkat lunak atau file basis data. |
| ⑤ | BNC coaxial connector, used to connect auxiliary devices such as ICC, DCC, CCC (if any), or to connect an external oscilloscope to view BNC-coupled waveforms |
| ⑥ | DUT power cable connector, used to connect the DUT; observe the polarity |

3.2 Kembali Panel
Lihat Gambar 3-2.
| Jumlah | Note |
|---|---|
| ① | Soket kabel daya dan sekering; pastikan catu daya input terhubung ke ground dengan benar. |
| ② | Circuit breaker, main input power supply switch for the equipment |
| ③ | Protective grounding terminal: If the input power supply does not have a reliable ground connection, a separate ground wire must be used to connect it to the ground. |
| ④ | Konektor Input Daya DUT: Catu daya eksternal yang sesuai harus disediakan untuk DUT. Anda dapat menggunakan LISUNGunakan catu daya empat kuadran seri LIS-APS, atau catu daya DC teregulasi lain yang sesuai untuk DUT. Perhatikan polaritasnya. |
| ⑤ | Sakelar Daya DUT |
| ⑥ | Antarmuka RS485/port LAN, yang dapat dihubungkan ke komputer untuk menggunakan perangkat lunak host (untuk keperluan pencadangan). Perangkat lunak host menawarkan fungsionalitas yang sama dengan layar sentuh; silakan hubungi kami jika diperlukan. |

3.3 Pengenalan Aksesori
Lihat Gambar 3-3.
| Jumlah | Note |
|---|---|
| ① | Kabel Listrik |
| ② | DUT Power Supply Input and Output Cables |
| ③ | The slim-profile output cable can be used to connect to LISUN’s calibration resistor, the LIS-CAR. |
| ④ | Kabel tanah |
| ⑤ | BNC adapter, used to connect to an external oscilloscope to view power line-coupled waveforms; be sure to observe the correct polarity when using it. |
| ⑥ | Insulation Protective Covers for DUT Input and Output Power Cables |
| ⑦ | Ethernet cable, used to connect a computer for use with host software |

4. Pengantar Program Layar Sentuh
4.1 Antarmuka Pengujian
4.1.1 The Pulse 1 Interface
Lihat Gambar 4-1.
| Jumlah | Note |
|---|---|
| ① | Waveform Selection: Click to select “Pulse 1” |
| ② | Schematic Diagram of Pulse 1 Waveform |
| ③ | Pulse 1 Standard Source and Test Instructions |
| ④ | Electrical System: Optional built-in 12V/24V system waveform parameters; custom parameters are also available. |
| ⑤ | Severity Levels: Select the appropriate severity level for each waveform as specified in the standard, as needed. |
| ⑥ | Load the test parameters saved by the device; this is generally not necessary. If you have previously customized parameters, you can load them. |
| ⑦ | Save the current test parameters. If you have custom parameters, you can click to save the current custom parameters to the device. You can manage them in the Files interface. |
| ⑧ | Pulse voltage: The built-in system waveform parameters have been set according to the standard and cannot be modified. When configuring custom parameters, you can set the pulse peak voltage Us. |
| ⑨ | Pulse Period: You can set the period of a single pulse; unless otherwise specified, use the default value. |
| ⑩ | Power-off time: the duration for which power to the 12V/24V system is disconnected. The built-in system waveform parameters have been set according to the standard and cannot be modified. These parameters can be set when configuring custom settings. |
| ⑪ | Pulse width: The built-in system waveform parameters are set according to the standard and cannot be modified. When configuring custom parameters, you can select the width of a single pulse from among 9 options ranging from 50 us to 2 ms. |
| 1 | For the rise time, the built-in system waveform parameters have been set according to the standard and cannot be modified. When configuring custom parameters, you can select the rise time for Pulse 1 from the options 1 us or 3 us. |
| ⑬ | Number of Pulses: Sets the number of pulses to be output during this operation. Unless otherwise specified, use the default value. |
| ⑭ | Power supply internal resistance: The built-in system waveform parameters have been set according to the standard and cannot be modified. When configuring custom parameters, you can select the internal resistance of the pulse source from the following options: 2 Ω, 4 Ω, 10 Ω, 30 Ω, 50 Ω, 60 Ω, and 100 Ω. |
| 3 | Waktu eksekusi ditampilkan dan dihitung secara otomatis; bilah kemajuan akan muncul untuk menunjukkan kemajuan pengujian setelah pengujian dimulai. |
| 5 | DUT: Click to turn on the DUT power; click again to turn it off. |
| ⑰ | JALANKAN: Setelah Anda memilih bentuk gelombang dan parameter lainnya, klik tombol ini untuk memulai pengujian. Selama pengujian, bilah kemajuan akan diperbarui setiap detik untuk menunjukkan kemajuan saat ini hingga pengujian selesai. Klik tombol ini lagi selama pengujian untuk menghentikan pengujian saat ini. |

4.1.2 Pulse 2a Interface
Lihat Gambar 4-2.
| Jumlah | Note |
|---|---|
| ① | Waveform Selection: Click to select Pulse 2a |
| ② | Pulse 2a Waveform Diagram |
| ③ | Pulse 2a Reference Sources and Test Instructions |
| ④ | Electrical System: Optional built-in 12V/24V system waveform parameters; custom parameters are also available. |
| ⑤ | Severity Levels: Select the appropriate severity level for each waveform as specified in the standard, as needed. |
| ⑥ | Load the test parameters saved by the device; this is generally not necessary. If you have previously customized parameters, you can load them. |
| ⑦ | Save the current test parameters. If you have custom parameters, you can click to save them to the device. You can manage them in the Files interface. |
| ⑧ | Pulse voltage: The built-in system waveform parameters have been set according to the standard and cannot be modified. When configuring custom parameters, you can set the pulse peak voltage Us. |
| ⑨ | Pulse Period: You can set the period for a single pulse; unless otherwise specified, use the default value. |
| ⑩ | Pulse width: The built-in system waveform parameters are preconfigured according to the standard and cannot be modified. When configuring custom parameters, you can select the width of a single pulse from among 9 options ranging from 50 us to 2 ms. |
| ⑪ | For the rise time, the built-in system waveform parameters have been set according to the standard and cannot be modified. When configuring custom parameters, you can set the pulse rise time. |
| 1 | Number of Pulses: Set the number of pulses to be output during this operation. Unless otherwise specified, use the default value. |
| ⑬ | The power supply’s internal resistance and the built-in system waveform parameters have been set according to the standard and cannot be modified. The power supply’s internal resistance can be modified when configuring custom parameters. |
| ⑭ | Coupling methods: Choose between power line output or BNC coaxial connector output. The coaxial output supports ICC (requires LISUN’s LIS-BCP110 ICC Current Injection Probe and LIS-CCF500 ICC High-Current Injection Probe) and DCC (requires LISUN’s DCC-100 DCC Coupling Capacitor). |
| 3 | Waktu eksekusi ditampilkan dan dihitung secara otomatis; bilah kemajuan akan muncul untuk menunjukkan kemajuan pengujian setelah pengujian dimulai. |
| 5 | DUT: Click to turn on the DUT power; click again to turn it off. |
| ⑰ | JALANKAN: Setelah Anda memilih bentuk gelombang dan parameter lainnya, klik tombol ini untuk memulai pengujian. Selama pengujian, bilah kemajuan akan diperbarui setiap detik untuk menunjukkan kemajuan saat ini hingga pengujian selesai. Klik tombol ini lagi selama pengujian untuk menghentikan pengujian saat ini. |

4.1.3 Pulse 3a/3b Interface
See Figures 4-3 and 4-4.
| Jumlah | Note |
|---|---|
| ① | Waveform Selection: Click to select Pulse 3a/3b |
| ② | Schematic Diagram of Pulse 3a/3b Waveforms |
| ③ | Pulse 3a/3b Standards Sources and Test Instructions |
| ④ | Electrical System: Optional built-in 12V/24V system waveform parameters; custom parameters are also available. |
| ⑤ | Severity Levels: Select the appropriate severity level for each waveform as specified in the standard, as needed. |
| ⑥ | Load the test parameters saved by the device; this is generally not necessary. If you have previously customized parameters, you can retrieve them. |
| ⑦ | Save the current test parameters. If you have custom parameters, you can click to save them to the device. You can manage them in the Files interface. |
| ⑧ | Pulse voltage: The built-in system waveform parameters have been set according to the standard and cannot be modified. When configuring custom parameters, you can set the pulse peak voltage Us. |
| ⑨ | Pulse duration: The built-in system waveform parameters are already set according to the standard and cannot be modified. When configuring custom parameters, you can set the duration of the pulse group. |
| ⑩ | Interval Time: The built-in system waveform parameters have been set according to the standard and cannot be modified. When configuring custom parameters, you can set the interval time between pulse groups. |
| ⑪ | Pulse frequency: The built-in system waveform parameters are already set according to the standard and cannot be modified. When configuring custom parameters, you can set the frequency of the output pulses within a pulse group. |
| 1 | Pulse width: The built-in system waveform parameters are already set according to the standard and cannot be modified. When configuring custom parameters, you can set the pulse group width. |
| ⑬ | For the rise time, the built-in system waveform parameters have been set according to the standard and cannot be modified. The pulse rise time can be set when configuring custom parameters. |
| ⑭ | Coupling methods: You can choose between power cord output or BNC coaxial connector output. The coaxial output supports two coupling methods: CCC (requires LISUN'S VFTC capacitive coupling clamp) and DCC (requires LISUN’s DCC-100 DCC coupling capacitor). |
| 3 | Runtime: Configurable; the standard minimum test duration is 3600 seconds. |
| 5 | DUT: Klik untuk menghidupkan daya DUT; klik lagi untuk mematikannya. |
| ⑰ | JALANKAN: Setelah Anda memilih bentuk gelombang dan parameter lainnya, klik tombol ini untuk memulai pengujian. Selama pengujian, bilah kemajuan akan diperbarui setiap detik untuk menunjukkan kemajuan saat ini hingga pengujian selesai. Klik tombol ini lagi selama pengujian untuk menghentikan pengujian saat ini. |


4.1.4 Pulse 5a/5b Interface
4.1.4.1 ISO 7637-2
See Figures 4-5 and 4-6.
| Jumlah | Note |
|---|---|
| ① | Waveform Selection: Click to select Pulse 5a/5b |
| ② | Schematic Diagram of Pulse 5a/5b Waveforms |
| ③ | Select the ISO 7637-2 standard |
| ④ | Pulse 5a/5b Standard Sources and Test Instructions |
| ⑤ | Electrical System: Optional built-in 12V/24V system waveform parameters; custom parameters are also available. |
| ⑥ | Severity Levels: Select the appropriate severity level for each waveform as specified in the standard, as needed. |
| ⑦ | Load the test parameters saved by the device; this is generally not necessary. If you have previously customized parameters, you can load them. |
| ⑧ | Save the current test parameters. If you have custom parameters, you can click to save them to the device. You can manage them in the Files interface. |
| ⑨ | Pulse Voltage: You can set the pulse peak voltage (Us) for Pulse 5a and the pulse clamping voltage (Us*) for Pulse 5b. Unless otherwise specified, use the default values. |
| ⑩ | Pulse Period: You can set the period for a single pulse. Unless otherwise specified, use the default value. |
| ⑪ | Pulse width: You can set the width of a single pulse; unless otherwise specified, use the default value. |
| 1 | Rise Time: You can set the rise time of the pulse. Unless otherwise specified, use the default value. |
| ⑬ | Number of Pulses: You can set the number of pulses to be output during this operation. Unless otherwise specified, use the default value. |
| ⑭ | Power Supply Internal Resistance: The internal resistance of the pulse source can be set within a range of 0.5 Ω to 40 Ω, with a resolution of 0.1. Unless otherwise specified, use the default value. |
| 3 | Current Cycle Duration Display |
| 5 | Total Runtime Display |
| ⑰ | DUT: Click to turn on the DUT power; click again to turn it off. |
| ⑱ | RUN: Once you have selected the waveform and other parameters, click this button to start the test. During the test, the progress bar updates once per second to show the current progress until the test is complete. Clicking this button again during the test will stop the current test. |


4.1.4.2 ISO 76750-2
See Figures 4-7 and 4-8.
| Jumlah | Note |
|---|---|
| ① | Select the ISO 16750-2 standard |
| ② | The DUT’s supply voltage must be entered; all other requirements are consistent with ISO 7637-2. |


4.2 Antarmuka File Basis Data
Lihat Gambar 4–9.
| Jumlah | Note |
|---|---|
| ① | Manajemen Pustaka Standar Rencana Pengujian. Anda dapat mengelola parameter pengujian khusus yang telah Anda simpan; jangan memodifikasi atau menghapus parameter pengujian yang sudah terpasang di perangkat. |
| ② | If you have other standard tests but do not wish to create custom tests, please contact us and send us the details of the relevant standards. We will guide you through the process of updating the database file with those standards directly using a USB drive. |

4.3 Antarmuka Pengaturan
Lihat Gambar 4-10.
| Jumlah | Note |
|---|---|
| ① | Beralih antara Bahasa Mandarin dan Bahasa Inggris |
| ② | Communication settings are set to “LOCAL” by default. If you need to use host computer software, you can switch to the RS485 or LAN port. Please contact us. |
| ③ | Pengaturan Volume |

4.4 Tentang Antarmuka
For device information, firmware version, and copyright notice, see Figure 4-11.

5. Procedures for Automotive Electronic Transient Immunity Testing
5.1 Define the Purpose of the Test
| Waveform | Tujuan Percobaan |
|---|---|
| Pulse 1 | Verification of the immunity of in-vehicle electronic devices to reverse voltage surges caused by the de-energization of inductive loads |
| Pulsa 2a | Verify the device’s immunity to forward voltage spikes caused by stray inductance in the power supply harness |
| Pulsa 3a/3b | Verification of the device’s immunity to high-speed, periodic, narrow pulse trains generated by arcing in mechanical switches |
| Pulsa 5a/5b | Simulate generator load shedding conditions to verify the equipment’s ability to withstand high-energy voltage spikes |
5.2 Prosedur Operasi Umum
5.2.1 Pengkabelan
Ensure that both the equipment and the DUT are powered off; use a test cable to connect the DUT output port on the equipment to the power input port of the device under test (DUT); Use a cable to connect an external power supply (LIS-APS or other regulated DC power supply) to the DUT input power supply connector on the back of the EMS-ISO7637; if external auxiliary equipment is required, complete the wiring as specified.
5.2.2 Pengaturan Parameter
Set the test parameters as described in Section 4.1.
5.2.3 Langkah-langkah Eksekusi Pengujian
Turn on the external power supply and check the DUT output; turn on the DUT power switch on the back of the EMS-ISO7637; switch to the corresponding waveform test interface, tap the DUT button on the touchscreen to verify that the DUT is operating normally; tap the RUN button to start the test; Observe the DUT’s operating status and record any observations; wait for the test to complete—in case of an emergency, press the Stop button to halt the test immediately.
5.3 Evaluasi Hasil
Grade A: Functionality is normal during and after testing, with no abnormalities; Grade B: Functionality is temporarily degraded or interrupted during testing but automatically recovers after testing; Grade C: Functionality fails during testing and requires manual intervention to recover; Grade D: The equipment is permanently damaged after testing and cannot be restored.
Standard requirements of major automakers: In-vehicle safety components must meet Grade A standards; for in-vehicle electrical systems and infotainment systems, Grade B may be accepted by mutual agreement, while Grade D is uniformly deemed non-compliant.
5.4 Prosedur di Akhir Tes
Ensure that both the equipment and the DUT are powered off; wait until the high-voltage capacitors have fully discharged (it is recommended to wait at least 5 minutes); first disconnect the DUT-side connections, then disconnect the equipment-side connections; disconnect the grounding wire and any connections to auxiliary equipment.
6. Pemeliharaan dan Perawatan Peralatan Harian
6.1 Pembersihan harian
6.1.1 Jadwal dan Prosedur Pembersihan
Setelah setiap digunakanBersihkan permukaan layar sentuh dan hilangkan debu dari panel perangkat;
Mingguan: Clean the equipment housing and the filters in the vents;
BulananBersihkan debu dari bagian dalam peralatan (harus dilakukan oleh profesional).
Instruksi Pembersihan
Wipe the exterior with a clean, soft, lint-free cloth; use a specialized screen cleaner for the touchscreen; clean the vents with a soft-bristled brush and a vacuum cleaner if necessary; do not use corrosive solvents such as acetone.
6.2 Inspeksi Berkala
Check the power cord for damage or wear; check that the ground connection is secure; check that the fan is operating normally; check that the buttons and touchscreen are responsive; check the terminals for oxidation or looseness.
6.3 Penyimpanan dan penanganan
6.3.1 Persyaratan Penyimpanan Jangka Panjang
Storage Conditions: Temperature: -10°C to +50°C; Humidity: ≤85%. Clean the equipment and apply dust protection before storage. Power on the equipment once every 3 months, running it for at least 30 minutes each time. Avoid stacking or applying heavy pressure to prevent the panel from warping.
6.3.2 Tindakan Pencegahan untuk Penanganan
Unplug all external cables before moving the equipment; use the original packaging and ensure it is properly cushioned and protected; keep the equipment upright during transport and avoid severe vibrations; when lifting, grip the bottom and sides of the equipment; do not lift by the panel.
6.4 Persyaratan Interval Kalibrasi
Untuk memastikan akurasi pengukuran dan keandalan operasional peralatan, disarankan agar peralatan tersebut secara berkala dikirim ke laboratorium metrologi pihak ketiga yang berkualifikasi untuk kalibrasi. Interval kalibrasi yang disarankan adalah 12 bulan. Pengguna dapat menentukan interval kalibrasi spesifik berdasarkan frekuensi penggunaan, kondisi lingkungan, dan persyaratan sistem mutu.
7. Pemecahan Masalah dan Penyelesaian Masalah Umum
| Gejala Kesalahan | Kemungkinan penyebab | Prosedur |
|---|---|---|
| Perangkat tidak mau menyala | Saklar daya utama catu daya input di bagian belakang tidak dinyalakan, atau sekring putus. | Turn on the input power supply switch located at the power cord socket on the back of the device; check the fuse, and if it has blown, replace it with a fuse of the same specification. |
| Kerusakan Layar Sentuh Setelah Dinyalakan | Sistem macet, kabel pita longgar | If the problem persists after restarting, disconnect the power, remove the device’s casing, and check whether the touchscreen ribbon cable is loose. |
| No pulse output after clicking “RUN” | The DUT did not start up properly | Verify that all connections are secure. Click “DUT” to ensure the DUT is in normal operating condition, then click “RUN” to start the test. |
| Test Stopped Automatically Midway | Proteksi suhu berlebih aktif, proteksi arus berlebih/tegangan berlebih aktif, gangguan pasokan daya eksternal. | Periksa apakah ventilasi peralatan terhalang atau suhu lingkungan terlalu tinggi; periksa DUT (Device Under Test) apakah terjadi korsleting atau kelebihan beban; periksa apakah catu daya eksternal telah berhenti mengeluarkan daya. |
| Drive USB Tidak Terdeteksi | USB drive format is incompatible or has too much storage capacity | Use a FAT32-formatted USB drive with a capacity of no more than 32 GB; if that doesn’t work, try a different USB drive. |

中文简体