Coupling Decoupling Network untuk Saluran Listrik
Pengguna manual
berlaku LISUN Model: CDN61000-5P,CDN61000-5P-T440V100A,CDN61000-5P-T440V20A,CDN61000-5P-T440V32A
1. Membuka Kemasan dan Mengenal Peralatan Secara Dasar
1.1 Spesifikasi Teknis Utama
1.1.1 Coupling Decoupling Network For Power Lines
| LISUN Pilih Model | CDN61000-5P-T440V20A | CDN61000-5P-T440V32A | CDN61000-5P-T440V100A |
| Coupled Waveforms | EC61000-4-5 composite surge waveforms 1.2/50 μs and 8/20 μs, IEC61000-4-12 ringing waveform | ||
| Maximum Surge Voltage/Current | 6 kV/3 kA (Requires use with the LISUN SG61000-5 series surge generator or the RWG61000-12 Ring Wave Generator) | ||
| Tahap | Asynchronous; Synchronous: 0°–360° | ||
| Metode Kopling | Common-Mode, Differential-Mode | ||
| Capacity of the Test Equipment | Three-phase / AC 440 V / 20 A | Three-phase / AC 440 V / 32 A | Three-phase / AC 440 V / 100 A |
1.1.1 Communication Coupling Decoupling Network
| LISUN Pilih Model | CDN61000-5C-H8CC | CDN61000-5C-H8BC | CDN61000-5C-M8TK | CDN61000-5C-M4CC | CDN61000-5C-M4BC | CDN61000-5C-L4BK |
| Tingkat Transfer Data | ≤1000 MB/s | ≤10 MB/s | ≤100 kB/s | |||
| Capacity of the Test Equipment | 8-Channel Interconnect Cable | 4-Channel Interconnect Cable | ||||
| Coupled Surge Waveforms | 10/700 μs and 5/320 μs | 1.2/50 μs and 8/20 μs | 1.2/50 μs and 8/20 μs, 10/700 μs and 5/320 μs | 10/700 μs and 5/320 μs | 1.2/50 μs and 8/20 μs | |
| Modus kopling | Mode umum | Compatible with differential-mode and common-mode signals | Mode umum | Compatible with differential-mode and common-mode signals | ||
| Jenis port | Unshielded, Symmetrical | Unshielded Balanced Cable, Unshielded Unbalanced Cable | Unshielded, symmetrical | Unshielded symmetrical cable, unshielded asymmetrical cable | ||
| Tegangan Uji Maksimum | 6 kV. Note: The 1.2/50 μs CDN must be used with the SG61000-5 generator; the 10/700 μs CDN must be used with the SG61000-5C generator. | |||||
| Objek Uji | Ethernet and LAN (e.g., RJ45) | LIN, CAN, RS-485, RS-232, RS-422, 4–20 mA | LIN, RS-232 | |||
1.2 Pemeriksaan dan Verifikasi Aksesori Saat Membuka Kemasan
1.2.1 Membuka Kemasan dan Pemeriksaan Visual
When unpacking the device, handle it gently to avoid scratching the outer casing with sharp tools. After unpacking, first inspect the exterior of the device to ensure there are no obvious deformations or dents, and that the buttons are not damaged or loose.
Jika Anda melihat adanya kerusakan atau perubahan bentuk pada peralatan atau aksesori, jangan nyalakan daya. Segera hubungi kami.
1.2.2 Unit Utama dan Aksesoris
Host Category: 1 Coupling Decoupling Network.
Standard Components for Coupling Decoupling Network for Power Lines: ① Power cord; ② RS-232 communication cable; ③ Banana plug cable; ground wire; ④ Isolation Transformer connection cable; ⑤ EUT sample connection cable; ⑥ Ground wire.

Gambar 1
The standard accessories for a communication line Coupling Decoupling Network consist of only two banana plug cables and one ground wire.
Download links for the digital user manual, warranty card, and other documents have been sent via email. Please download them as soon as possible. If you missed the email, please feel free to contact us to receive the download links again.
1.2.3 Mengunduh Dokumen Elektronik
Kami telah mengirimkan tautan unduhan untuk manual pengguna elektronik, sertifikat kalibrasi, kartu garansi, dan dokumen lainnya melalui email pada saat pengiriman. Silakan unduh sesegera mungkin. Jika Anda belum menerima email tersebut, silakan hubungi kami untuk meminta tautan unduhan lagi.
2. Operation and Use
2.1 CDN61000-5P Coupling Decoupling Network For Power Lines
2.1.1 Pengkabelan
Connections between the SG61000-5 Series Surge Generators and the CDN61000-5P Series Coupling Decoupling Network for Power Lines:

Gambar 2

Gambar 3
Note: For operating instructions, please refer to the SG61000-5 User Manual. Simply connect all wiring related to the built-in CDN network to the external CDN.
2.1.2 CDN61000-5C Signal Line Coupling Decoupling Network
Connections between the SG61000-5 Series Surge Generators and the CDN61000-5C Series Signal Line Coupling Decoupling Networks:

Gambar 4
Catatan: Ketika SG61000-5 series Surge Generator is used in conjunction with the CDN61000-5C series Coupling Decoupling Network, it functions equivalently to the SG61000-5C. Please refer to the SG61000-5C Operating Instructions.
3. Penyimpanan Peralatan
3.1 Persyaratan Penyimpanan Jangka Pendek
If the equipment is used on a daily basis, no further action is required after each test and cleaning are completed.
3.2 Persyaratan untuk Penyimpanan Jangka Panjang
If the device will not be used for an extended period (more than 1 month), please disconnect all cables and cover the device with a dust cover to prevent dust buildup.
Perangkat ini sebaiknya dinyalakan sekali sebulan selama setengah jam saja untuk mencegah penuaan komponen listrik (seperti kapasitor dan kontaktor).

中文简体